EV Charging Stations in Shogran
Part of the ChargePK guide to EV charging in Pakistan · Updated July 2026
Shogran's Cedarwood resort charger (with 24/7 backup power) lets EVs overnight-charge at 2,400 metres before exploring the Kaghan Valley. ChargePK lists the public charging station here with connectors, power and prices — see them live on the charger map or in the free app.
EV charging in Shogran: station details
Tap any of these on the live charger map for directions and phone numbers. Community-submitted stations are verified and added continuously — if we're missing one, submit it here.
Charger types explained
What the numbers above mean in practice:
| Charger | Typical power | Connector | Time |
|---|---|---|---|
| AC (slow) | 7–22 kW | Type 2 | 3–8 hours |
| DC fast | 30–120 kW | CCS2 / CHAdeMO | 30–90 min |
| DC ultra-fast | 120–360 kW | CCS2 | 15–40 min |
EV routes from Shogran
Where drivers typically head next — all mapped in ChargePK's journey planner with every charger within 25 km of the route:
- Balakot down the valley road
- Naran further up the Kaghan Valley
See every charger in Pakistan
ChargePK is free — live map, journey planner and charging calculator. Get it on your iPhone.
Download on the App StoreFrequently asked questions
Is there an EV charging station in Shogran?
Yes — ChargePK lists 1 public charging station in Shogran, with power up to 7 kW and prices from around PKR 150 per kWh. Each listing includes connectors, directions and a phone number where available.
How much does EV charging cost in Shogran?
Listed prices in Shogran start around PKR 150 per kWh. Public charging across Pakistan typically runs PKR 40–160 per kWh depending on operator and speed.
Can an EV make it up to Shogran?
Yes — the climb from Kewai is steep but short. Charge in Balakot first, then use Cedarwood's Type 2/socket charging (backed by generators) overnight.